Family: Saturn · Boeing

Saturn V

Compare

Launch statistics

13
Total launches
—
Successes
—
Failures
—
Success rate

The Saturn V was the three-stage super heavy-lift launch vehicle NASA developed for the Apollo programme and the first to carry humans beyond low Earth orbit. Thirteen vehicles flew between 1967 and 1973; nine sent twenty-four astronauts towards the Moon and the last one placed Skylab in orbit.

Missions

Continue to Current affairs →

Saturn V in the news

Continue to Technical data →

Three-view drawing

Three-view drawing of Three-view drawing
Three-view drawingSaturn V S IC diagram
Three-view drawing of Cutaway
CutawayCutaway diagram of the Saturn V launch vehicle and Apollo spacecraft

Continue to History →

History

The Saturn V was designed at the Marshall Space Flight Center in Huntsville, Alabama, as the largest production model of the Saturn family. The programme was managed by George Mueller and the technical design led by the group of scientists who had come from Germany, headed by Wernher von Braun with Kurt Debus and Arthur Rudolph alongside him — the same team that had developed the first US launch vehicles of the Redstone family at the Army Ballistic Missile Agency. The industrial split was as colossal as the rocket: Rocketdyne built every engine; Boeing the S-IC first stage, burning kerosene and liquid oxygen and driven by five F-1 engines that remain the most powerful single-chamber liquid-fuelled engines ever built; North American Aviation the S-II second stage and the Douglas Aircraft Company the S-IVB third stage, both hydrogen-oxygen and powered by five J-2 engines and one respectively. IBM and Marshall itself signed the instrument unit that served as its brain.

With the Apollo spacecraft on top, the stack stood some 111 metres tall. Its first flight was the Apollo 4 test mission in November 1967. Thirteen Saturn V vehicles were launched in all, every one of them from Launch Complex 39 at the Kennedy Space Center, and nine of them sent twenty-four astronauts towards the Moon between Apollo 8 and Apollo 17; Apollo 11 carried the first crew to set foot on the lunar surface in 1969. The rocket still holds the record for the largest payload capacity to low Earth orbit, 140,000 kilograms, a figure that includes the S-IVB third stage with the propellant it had yet to burn to send the command and service module and the Lunar Module towards the Moon. At 34.5 meganewtons of thrust at liftoff it is the fourth most powerful rocket ever flown and the second most powerful among those that have carried a crew.

Saturn V
Saturn V configuration diagram by the Boeing Company

The last Saturn V did not go to the Moon: it launched Skylab, the first American space station, converted from one of its own third stages. Two further vehicles were built but never flew, once assigned to the cancelled Apollo 19 and 20, along with three ground test articles. Budget cuts buried a long list of follow-on projects — the Saturn II, the Saturn MLV, the Saturn V ELV, the C-5N variant with a NERVA nuclear stage, the Saturn-Shuttle — and with them any prospect of building more. Until the Space Launch System repeated the feat, the Saturn V was the only launch vehicle that had ever carried people beyond low Earth orbit.

Launch timeline

DateLaunch siteProgramOutcomePayload

Continue to Versions →

Versions

Saturn V (three-stage Apollo configuration)Saturn INT-21
First launchNovember 9, 1967—
Last launchDecember 7, 1972—
PowerplantS-IC first stage (Boeing): five Rocketdyne F-1s in a quincunx, liquid oxygen and RP-1; 33,000 kN at sea level, 42 m tall and 10 m across, about 137,000 kg dry and 2,214,000 kg fuelled; about 150 s burn. S-II second stage (North American Aviation): five Rocketdyne J-2s, liquid oxygen and liquid hydrogen; 4,400 kN in vacuum, 24.87 m tall, about 43,000 kg dry and 470,000 kg fuelled (including the interstage); 395 s. S-IVB third stage (Douglas): one restartable Rocketdyne J-2, liquid oxygen and liquid hydrogen; 1,000 kN in vacuum, 17.86 m tall and 6.60 m across, about 15,200 kg dry and 120,500 kg fuelled (including the Instrument Unit); two burns of 165 and 312 s. Instrument Unit (IBM) carrying guidance and control.S-IC: 5 Rocketdyne F-1, RP-1 and liquid oxygen, about 150 s of burn, 34.02 MN. S-II: 5 Rocketdyne J-2, liquid hydrogen and liquid oxygen, about 360 s of burn, 5 MN. No third stage; in the study the instrument unit sat on top of the S-II.
PropellantLOX / RP-1 (S-IC); LOX / LH2 (S-II, S-IVB)—
Height111 m Best value in this row98.5 m
Diameter10.1 m Best value in this row10.1 m
Mass2,965,241 kg Best value in this row2,916,080 kg
Liftoff thrust33,000 kN Best value in this row33,000 kN Best value in this row
Stages32 Best value in this row
LEO capacity140,000 kg Best value in this row115,900 kg
ReusableNoNo

Continue to Images →

Images

Saturn V
Saturn V AS-506 lifts off from Kennedy Space Center with Apollo 11, 16 July 1969
Saturn V
Saturn V configuration diagram by the Boeing Company
Saturn V
Wernher von Braun beside the five F-1 engines of a Saturn V first stage
Saturn V
Technician checking the systems of the Saturn V instrument unit
Saturn V
A J-2 engine is lifted into a test stand
Saturn V
Saturn V S-IVB third stage with its J-2 engine on a transporter at Marshall
Saturn V
Saturn V S-II second stage emerging from its shipping container at Marshall
Saturn V
Saturn V S-II second stage lowered into place at Seal Beach, California
Saturn V
Saturn V first stage lowered to the ground after a static test firing at Marshall
Saturn V
Saturn V S-IC first stage aboard the NASA barge Pearl River
Saturn V
Saturn V S-IC-5 flight stage hoisted into the S-IC-B1 test stand
Saturn V
Static test firing of the Saturn V S-IC-5 flight stage at the Mississippi Test Facility
Saturn V
First static test firing of all five F-1 engines of the Saturn V S-IC stage
Saturn V
F-1 engines stored in the F-1 Engine Preparation Shop at Marshall Space Flight Center
Saturn V
F-1 engine for the Saturn V first stage dwarfing a technician
Saturn V
Close-up of the F-1 engine of the Saturn V S-IC first stage
Saturn V
Installing an F-1 engine on the Saturn V S-IC thrust structure at Marshall
Saturn V
Saturn V S-IC boosters in the horizontal assembly area, Michoud Assembly Facility
Saturn V
Stacking the major components of the Saturn V S-IC first stage at Michoud
Saturn V
Overhead crane lifts the Apollo 11 Saturn V first stage in the VAB transfer aisle
Saturn V
Apollo 10 Saturn V S-IC first stage lifted by crane in the Vehicle Assembly Building
Saturn V
Saturn V AS-506 arrives at Launch Complex 39 pad A, 20 May 1969
Saturn V
Apollo 11 Saturn V and mobile launcher on the crawler-transporter, 20 May 1969
Saturn V
AS-501: first flight of the Saturn V launch vehicle, 9 November 1967
Saturn V
Apollo 11 Saturn V climbing away from Pad 39A
Saturn V
Apollo 11 Saturn V (SA-506) liftoff from Launch Complex 39A
Saturn V
Prelaunch rollout of Apollo 17 (KSC)
Saturn V
Launch of the Apollo 17 lunar landing mission (night liftoff)
Saturn V
Launch of the Apollo 17 lunar landing mission
Saturn V
Apollo 16 liftoff
Saturn V
Apollo 15 mission insignia
Saturn V
Apollo 15 archival material, KSC 2011
Saturn V
Apollo 15 landing site preparation, KSC 2011
Saturn V
Apollo X launch, Pad 39B, Kennedy Space Center
Saturn V
Apollo 15 lunar eclipse views
Saturn V
Astronauts Scott and Irwin join geologists reviewing Apollo 15 samples
Saturn V
Aerial, high angle view of Apollo 10 on Pad B, Launch Complex 39, KSC
Saturn V
Scientific Instrument Module to be flown on Apollo 15
Saturn V
Apollo 10 Saturn V on Launch Pad 39B
Saturn V
Apollo 10 Saturn V (AS-505) rollout to Launch Complex 39B
Saturn V
Astronaut Alfred Worden, Apollo 15 Command Module Pilot
Saturn V
Mission Control Center activity during Apollo 15 EVA
Saturn V
Mission Control Center during Apollo 15 EVA
Saturn V
Mission Control Center at conclusion of Apollo 15 lunar landing mission
Saturn V
Apollo 12 liftoff on November 14, 1969
Saturn V
Apollo 15 prime crew portrait
Saturn V
Apollo 12 countdown rehearsal at Kennedy Space Center
Saturn V
Telephoto view across Hadley Rille during Apollo 15 EVA
Saturn V
Relatively fresh crater photographed during Apollo 15
Saturn V
The Saturn V vents liquid oxygen during a countdown rehearsal
Saturn V
Schroter's Valley area photographed by Apollo 15
Saturn V
The Saturn V on launch pad 39A
Saturn V
Transfer of the Saturn V alongside the mobile service structure
Saturn V
St. George crater and rille as seen by Apollo 15
Saturn V
The Apollo 12 Saturn V on the crawler-transporter
Saturn V
Crater Tsiolkovsky on lunar farside seen by Apollo 15
Saturn V
The space vehicle on its way to pad 39A
Saturn V
Mount Hadley as photographed by Apollo 15 during EVA
Saturn V
Members of Apollo 15 crew with Lunar Roving Vehicle One G trainer
Saturn V
The space vehicle leaves the Vertical Assembly Building
Saturn V
View of Earth photographed by Apollo 15 on voyage to the Moon
Saturn V
Stacking of the Saturn V in the Vertical Assembly Building
Saturn V
Mount Hadley photographed during Apollo 15
Saturn V
Saturn V components in the Vertical Assembly Building
Saturn V
Apollo 15 space vehicle on way from VAB to Pad A, Launch Complex 39
Saturn V
Bean, Gordon and Conrad during the rocket's transfer to the pad
Saturn V
Apollo 15 Command/Service Module in lunar orbit
Saturn V
The crew poses beside the Apollo 12 Saturn V
Saturn V
Astronaut James Irwin works at the Lunar Roving Vehicle during Apollo 15 EVA
Saturn V
Launch of Apollo 14 Lunar Landing Mission from Kennedy Space Center
Saturn V
Launch of the Apollo 14 lunar landing mission
Saturn V
Launch of unmanned Skylab 1 space vehicle (S73-26913)
Saturn V
Launch of unmanned Skylab 1 space vehicle (S73-26912)
Saturn V
Skylab 1/Saturn V launch from Pad 39A, 14 May 1973 (S73-26911)
Saturn V
Saturn V (SA-513) lifting off with the Skylab 1 orbital workshop (view 4)
Saturn V
Saturn V (SA-513) lifting off with the Skylab 1 orbital workshop (view 3)
Saturn V
Saturn V (SA-513) lifting off with the Skylab 1 orbital workshop (view 2)
Saturn V
Saturn V SA-506 (Apollo 11) liftoff from LC-39A, 16 Jul 1969
Saturn V
Saturn V (SA-513) lifting off with the Skylab 1 orbital workshop
Saturn V
Saturn V SA-501 (Apollo 4) at LC-39A awaiting launch, 9 Nov 1967
Saturn V
Launch of SA-513 (Skylab 1), two stage Saturn V, 14 May 1973
Saturn V
Rollout of the Apollo 11 Saturn V from VAB High Bay 1 to LC-39A, 1969
Saturn V
Apollo 8 (Saturn 503) Saturn V leaving the Vehicle Assembly Building for Pad A, 9 Oct 1968
Saturn V
Apollo 17 (Saturn 512) Saturn V at Pad A at night with searchlights, Nov 1972
Saturn V
Apollo 17 (Saturn 512) Saturn V launch, 7 Dec 1972
Saturn V
Apollo 8 (Saturn 503) Saturn V launch from Pad A, LC-39, 21 Dec 1968

Continue to Videos →

Videos

Show the 56 more

Continue to Overview →

Did you know… about Saturn V

  • How much apollo 11 cost?

    NASA never published a price for Apollo 11 on its own; what is documented is the program. The United States spent $25.8 billion on Project Apollo between 1960…

  • How does apollo 11 work?

    By splitting the task between vehicles. A Saturn V sent the stack moonward with a translunar injection burn of 5 minutes, 48 seconds; Columbia waited in lunar…

  • Why did apollo 11 go to the moon?

    Because the United States had publicly committed itself to it. On 25 May 1961 Kennedy asked Congress to back landing a man on the moon and returning him…

  • How long is the saturn v?

    The Saturn V stood 110.6 m (363 ft) tall with the Apollo spacecraft and escape tower in place, and its first stage was 10.1 m (33 ft) in diameter. It held the…

  • How long did the saturn v take to build?

    Development of the Saturn V ran from 1962, when NASA settled on the configuration, to its first flight in November 1967 — roughly five and a half years from…