Did you know…
How much does the 737 max cost?
Short answer
Boeing has not published list prices since 2019. In that final list the 737 MAX 7 was $99.7 million, the MAX 8 $121.6 million, the MAX 9 $128.9 million and the MAX 10 $134.9 million. Real contracts are confidential and settle well below those numbers, so the list price is a reference point, not a market price (data as of September 2026).

The last list Boeing published
Manufacturers used to publish annual catalogue prices. Boeing's final list, in 2019, put the 737 MAX 7 at $99.7 million, the MAX 8 at $121.6 million, the MAX 9 at $128.9 million and the MAX 10 at $134.9 million. Then it stopped, as Airbus had a year earlier. The reasoning was straightforward: published figures had drifted so far from signed contracts that quoting them misled everyone, and neither company wanted to keep feeding a number nobody paid.
What a customer actually negotiates
A campaign price turns on order size, delivery slots, the value of being a launch or reference customer, credit memos for spares and training, escalation formulas indexed to labour and materials, and residual-value or buy-back guarantees. Those terms are contractual secrets on both sides; even airline annual reports disclose aircraft commitments in aggregate, never per unit. Two carriers taking identical aeroplanes in the same month can pay materially different amounts, and a lessor ordering two hundred frames is not in the same conversation as a flag carrier taking six.
How to read an order announcement
Because of all this, the headline value still occasionally attached to a new order is a marketing figure rather than revenue. A more useful anchor is what the aircraft costs to own and operate: fuel burn per seat, maintenance intervals, engine shop-visit costs and the resale value eight to twelve years out, which is where narrowbody economics are genuinely decided. The purchase invoice is only the opening line of a twenty-year spreadsheet, and airlines choose between types on the rest of it.
More questions

Foto: 4300streetcar (CC BY 4.0) Commercial aviation
Which 747 carried Enterprise "piggyback"?
The first Shuttle Carrier Aircraft was a Boeing 747-123 registered N905NA, originally built for American Airlines and acquired by NASA in 1974. Boeing… more…

Commercial aviation
Was there an amphibious DC-3?
Yes: the Douglas XC-47C was created by fitting Edo Model 78 floats onto a standard C-47. The single-step metal floats carried retractable wheels that also… more…
_Berliner_Luftbr%C3%BCcke.jpg)
OTFW, Berlin (CC BY SA), vía commons Commercial aviation
Was a C-47 converted into a glider?
Yes: the Douglas XCG-17 was an assault glider created by converting a twin-engine C-47 Skytrain during World War II. Its engines were removed and the nacelles… more…

Commercial aviation
What did the USSR build from the DC-3?
The USSR built a version of the DC-3 under a licence granted to its government on 15 July 1936. It was designated PS-84 and, in 1942, renamed Lisunov Li-2… more…

Commercial aviation
What was "Puff, the Magic Dragon"?
It was the nickname of the Douglas AC-47 Spooky, the first in a series of fixed-wing gunships developed by the United States Air Force during the Vietnam War… more…

Commercial aviation
How did the RAF refer to the C-47?
The RAF called it Dakota: the Dakota I was the designation for 53 C-47s received under Lend-Lease. The Dakota III designated 962 C-47A Skytrains. The Dakota… more…